CapEx & Value-Add Execution Tracker

Track value-add execution against the underwriting before slippage becomes a capital-stack problem.

★ 105 on GitHub0 downloads on LenderSkills

Free · v1.3.0

Install it in one line — paste a single command into Claude, ChatGPT or Cursor and it writes the skill into your project.

Free, and about thirty seconds: a work email and a six-digit code.

Screened

Downloading shares your name, firm, role, and email with Avi Hacker, J.D.. That introduction is what keeps every skill here free.

What this skill does

Measures post-close value-add progress against what was underwritten, unit by unit.

What it does

  • Compares unit-turn cost to budget
  • Measures realized rent premiums against the pro forma
  • Tracks schedule adherence and yield-on-cost
  • Names the specific failure modes that turn a good deal into a capital-stack problem

When to use it

  • Monthly asset-management report or LP quarterly supplemental
  • Bridge-to-perm loan decision point where the take-out lender needs realized NOI
  • Mid-program re-baseline when actuals have diverged from plan
  • Hold / sell / refi analysis requiring durable post-renovation NOI
  • Supplemental / green-rewards loan sizing against projected post-renovation rents

What to have ready

  • CapEx program budget — interior-renovation total budget, common-area / amenity budget, major-systems budget (kept separate), and the contingency line. Per-unit…
  • Actual spend to date — $ spent cumulatively and month-to-date, split by interior unit renovations, common area, and major systems. Contingency committed and…
  • Units renovated — cumulative count, month-over-month completions, unit-type mix (studio / 1BR / 2BR / 3BR), and the scope tier per unit (Light / Medium / Heavy).
  • Renovated-vs-classic rent premium achieved — achieved face rent on renovated units, matched classic (non-renovated) rent at the same property, and the underwritten…
  • Schedule vs plan — original program start / completion dates, current milestone status (kickoff / GC selected / 10% / 25% / 50% / 75% / 100%), and forecast…
  • Concessions on renovated units (free months, reduced rent, move-in incentives) so face premium can be converted to effective premium
  • …and a few more items the skill will ask for as it goes

How to use it

  1. Download it with the button above. You'll sign in with a work email — that's how the creator knows who is using their skill.
  2. Copy the install prompt from the "Run it in Claude" box, and paste it into Claude along with the file. Claude installs the skill, fills in your firm's details where the file has [BRACKETED] placeholders, and runs a quick test with you.
  3. Then just ask in plain English. Claude picks the skill up on its own when a request matches it. Anything it still needs, it asks you for — it won't invent a number.

"Use the CapEx & Value-Add Execution Tracker skill — I've got capex program budget interior-renovation total budget."

What you get back

A structured report covering program snapshot, unit-turn execution table, rent-premium realization, schedule vs plan, cost-overrun analysis, premium-realization failure modes flagged, and roi summary. You get it as readable analysis plus the underlying data, so it can feed straight into a memo or another skill.

Good to know

  • Output quality tracks input quality. A missing figure is flagged as missing — it is never estimated to fill a gap.
  • Every draft is a starting point for your own review, not a finished decision.
  • Runs anywhere Claude does: the Claude app, Claude Desktop, or Claude Code.

Source & credit

Imported from the open-source cre-agent-skills library by Avi Hacker, J.D. (github.com/ahacker-1/cre-agent-skills), Apache-2.0 license. The author's content is unmodified apart from a legal disclaimer appended at the end of the package. Full credit to the author.

Legal disclaimer

This skill drafts; it does not decide. Its output is not legal, tax, accounting, appraisal, or investment advice, and using it creates no attorney-client, fiduciary, or advisory relationship. Nothing it produces is a commitment to lend or an offer to sell a security. Verify every number, date, citation, and conclusion against the source documents, and have a qualified professional licensed in the relevant jurisdiction review the work before you rely on it or send it to a borrower, investor, counterparty, or regulator. Laws, rates, and market data change. The final work product is yours.

Inside this skill

The actual file you get. Members can read it in full before saving it.

Imported to LenderSkills.ai from the open-source cre-agent-skills library.
Author: Avi Hacker, J.D. - https://github.com/ahacker-1/cre-agent-skills
License: Apache-2.0 (see repository LICENSE). Redistributed with attribution; the author's content is unmodified apart from a legal disclaimer appended by LenderSkills at the end of the file.
Imported: 2026-07-26
The knowledge/ and research/ files linked below live in the upstream repository.

CapEx & Value-Add Execution Tracker

Track post-close multifamily value-add execution against underwriting: unit-turn cost vs budget, rent-premium realization vs pro-forma, schedule adherence, yield-on-cost, and the failure modes that convert a good deal into a capital-stack problem.


When to Use This Skill

Use this skill when an asset manager, owner-operator GP, LP reporting team, or construction manager needs a monthly/quarterly read on how a value-add capital plan is performing against the acquisition underwriting. It is the right starting point any time the deal thesis depends on renovation-driven rent lift and the question is no longer "will we close?" but "are we delivering what we underwrote?"

Typical triggers:

  • Monthly asset-management report or LP quarterly supplemental
  • Bridge-to-perm loan decision point where the take-out lender needs realized NOI
  • Mid-program re-baseline when actuals have diverged from plan
  • Hold / sell / refi analysis requiring durable post-renovation NOI
  • Supplemental / green-rewards loan sizing against projected post-renovation rents

This skill is not the right tool for pre-acquisition capex underwriting (see Due Diligence pack), replacement-reserve accrual modeling (see R1 / renewal-economics KB), or routine non-renovated turnover economics (see R4). Hand off to those skills where those questions dominate.


What You'll Need to Provide

Required:

  • CapEx program budget — interior-renovation total budget, common-area / amenity budget, major-systems budget (kept separate), and the contingency line. Per-unit budget by scope tier (Light / Medium / Heavy).
  • Actual spend to date — $ spent cumulatively and month-to-date, split by interior unit renovations, common area, and major systems. Contingency committed and contingency remaining.

Reading the full skill counts as a download. The contributor receives your name, company, and email.

Ratings & reviews

★★★★★Rate this skill

No written reviews yet. If you run this on a live file, say how it went. The next lender reading this page is deciding whether to trust it.

Examination record

Archive inspectionPackage unpacked in isolation; contents and paths verified
Executable & binary blockExecutables, binaries, and scripts rejected automatically
Static analysisScanned for exfiltration, credential access, obfuscation, prompt injection
Human reviewA moderator read the skill end to end. Retired on 14 September 2026 — screening decides now.
What each gate checks

Run it in Claude

  1. Copy the install command above
  2. Paste it into Claude, ChatGPT or Cursor
  3. It writes the skill in, fills in your firm’s details, and test-runs it with you

Prefer the file? The prompt above is for a package you already downloaded.

New to skills? Read the 5-minute guide →

Details

Version1.3.0
AddedJul 26, 2026
UpdatedJul 26, 2026
CategoryAsset Management
Downloads0
On GitHub★ 105
Tagscapex, value-add, yield on cost